DAILY SCAFFOLD SAFETY CHECKLIST
NO |
SCAFFOLD TYPE |
SCAFFOLD TAG NO |
ERECTED BY |
DEFICIENCY NO |
DATE |
1 |
|
|
|
|
|
2 |
|
|
|
|
|
3 |
|
|
|
|
|
4 |
|
|
|
|
|
5 |
|
|
|
|
|
6 |
|
|
|
|
|
7 |
|
|
|
|
|
8 |
|
|
|
|
|
9 |
|
|
|
|
|
10 |
|
|
|
|
|
11 |
|
|
|
|
|
12 |
|
|
|
|
|
13 |
|
|
|
|
|
14 |
|
|
|
|
|
15 |
|
|
|
|
|
16 |
|
|
|
|
|
17 |
|
|
|
|
|
18 |
|
|
|
|
|
19 |
|
|
|
|
|
20 |
|
|
|
|
|
NO |
ITEMS TO BE CHECKED / DEFICIENCY LIST |
1 |
Scaffold and foundation adequate for purpose. |
2 |
Scaffold materials within specification. |
3 |
Scaffold symmetrical (horizontally and vertically aligned). |
4 |
Status card system in place (SCAFTAG). |
5 |
Safe Working Load Marked on structure or status system. |
6 |
Appropriate Warning Signs and Notices in place. |
7 |
Scaffold not supported by process lines |
8 |
Scaffold does not foul process valves, push buttons or other control devices. |
9 |
Ladders correctly positioned and secured. |
10 |
Tubes are free from cracks, dents, surface flaws, laminations, corrosion and splits |
11 |
All planks are free from rot, large knots, a cluster of knots, splits, cracks, gum-veins, nails and notches. |
12 |
Boards clouted and secure. Toe boards fitted and secured. |
13 |
Planks are not warped or painted. |
14 |
All planks have metal bands at both ends. |
15 |
Access ways clear for emergency escape. |
16 |
Hand rails fitted, secure, and at correct height. |
17 |
Intermediate rails fitted, secure and at correct height. |
18 |
Base plates in place and effective. |
19 |
Tube ends protected near access points. |
20 |
Couplers maintained and fit for purposes. |
21 |
Anchorage points comply with approved standards. |
Comments:
|
Reviewer name: |
|
Date: |
|
Position: |
|
Signature: |
|